Projects
There are no borders to the dream of complete waterproofing.
Railway Structures
Civil engineering and waterproofing for the Byeollae Line Line 8 extension
- Construction period : 2027.8.23 ~ 2024.8.31
- Project Overview : Line 8 Amsa Station to Byeollae New Town extension section
- Waterproofing method : The entire GTR method
- Technical Features :
- High-adhesion turbosheet GTR and cast-in-place concrete structures
- Technology combining attachable Pre-GTR
- waterproofing materials :
- Flooring _ PRE-GTR Reverse Casting Sheet
- Upper Slab _ Turbo Seat GTR
- Wall_ Turbo Seat GTR BW

Pre-construction site


PRE-GTR reverse casting sheet

Gwangju Metro Line 2
- Construction period : 2013 ~ 2030
- Project Overview : An expanded circular route with a circular line structure connecting Gwangju City Hall ⭢ Cheomdan ⭢ Gwangju City Hall
- Technical Features :
- High-adhesion Turbo Sheet GTR and Cast-in-Place Concrete
- Technology combining Pre-GTR attachable to the structure
- Use of eco-friendly and high-performance waterproofing materials
- waterproofing materials :
- Flooring _ PRE-GTR Reverse Casting Sheet
- Upper Slab _ Turbo Seat GTR
- Wall _ Turbo Seat GTR BW

The entire GTR method

PRE-GTR reverse casting sheet

Northeast Line subway

Daegok-Sosa Double-track Railway

Bujeon-Masan Double-track Railway


Waterproofing of protective walls

Waterproofing of protective walls

H-beam reinforcement

Boston Subway

San Francisco BART